The action behind the scenes
Process
ModArch Modular
The better way to build
Efficient and sustainable from start to finish
Modular vs Traditional
Modular construction excels in speed, cost efficiency, and sustainability. Off-site fabrication reduces construction time and waste, leading to significant savings. The adaptability of standardized modules offers flexibility for modifications and expansions, making it a practical choice for modern construction.
design
material sourcing
manufacturing
on-site preparation
transportation
on-site construction
step 1
Fully Visualized with BIM
- Clients collaborate with the modular design team
- Define property specifics, budget, and aesthetics
- Mutual understanding of building materials and module architecture
- BIM technology is used for accurate visualization of envisioned structures
step 2
An Expansive Network for Supply and Sourcing
- Initiate material procurement
- Codify the supply chain
- Familiar designs leverage existing supply chains
- Unique projects may require new sourcing
- Perfect cost certainty for the final product
step 3
Production Mastery Through Experience
- Key advantage: Simultaneous manufacturing and on-site preparation
- Manufacture stack modules overseas
- Technique and efficiency mastered through countless trials
- Utilize precise laser-cut steel pieces
- Automation to ensure precision and efficiency
step 4
Concurrent and Efficient Site Preparation
- Our partners handle manufacturing while the on-site team focuses on foundations, flatwork, and utilities
- Site infrastructure development includes walkways, driveways, and addressing obstacles
- Setting up heavy equipment for module assembly
- Take a phased approach to ensure efficient construction processes
step 5
Logistics Precisely Calculated
- The logistics team plans transportation during the manufacturing
- Complete supply chain network from Asia to North America
- Utilize a combination of ship, rail, and road
- Modules can reach any destination in Canada
step 6
All the Pieces put Together
- All pieces are preset and prebuilt
- Rapid assembly process
- Finishing touches applied and utilities installed
- Prefabricated MEP systems connected
- Final cleanup
- Building handover signifies project completion